The Executive Engineer, Works Division- VII (NH) PWD, Panaji, Administrator of NH-66 from Patradevi to Zuari bridge has ordered closure of the New Mandovi bridge, for all types of vehicular traffic from March 27, 2025 to April 05, 2025. Traffic having Gross vehicle weight (GVW) up to 12.00 tons will be diverted on Old Mandovi bridge and vehicles having GVW more than 12.00 tons on Atal Setu bridge to facilitate overlaying of carpet along with safety measures and painting of the bridge.





