Goan Reporter:POWER SHUTDOWN

38

Panaji: May 18, 2026

A power shut down has been arranged on May 20, 2026 from 09.00 am to 01.00 pm at 11 KV Chinchinim feeder, Chinchinim to carry out urgent maintenance works. Affected areas are Chichinim health centre, Chichinim Bazar, Deussa, Succofarm, Dandeawaddo and Suco farm.

Previous articleGoan Reporter:GPS, PONDA SCHOOL RENAMED
Next articleGoan Reporter:RESTRICTIONS ON SALE OF LIQUOR DURING BYE-ELECTION