The Executive Engineer, Administrator of NH-66 from Patradevi to Zuari bridge, has notified diversion of traffic of the Left Hand Side (L.H.S.) service road from Bambolim Military Camp ground to Holy Cross, Bambolim to main carriage way and shall merge the existing L.H.S service road at Holy cross Ch. 524/600 for onward transit from November 05, 2026 to December 31, 2026 to facilitate hindrance free and speedy completion of work..

Previous articleGoan Reporter:GOA MLAS PARTICIPATE IN PAC CONFERENCE AT KERALAM
Next articleGoan Reporter:POWER SHUTDOWN